1.The twin horizontal machining centers adopts a composite dual-channel system control and mechanical spindle, which can meet the large torque cutting and high processing efficiency.
2.The overall machine runs smoothly. It has multi-process processing technology such as milling, drilling, and tapping, and can achieve one-time clamping and one-time forming processing technology.
Model |
GDM-1940NC |
Category |
Attribute |
Value |
Unit |
Travel |
X-axis travel |
800 |
mm |
Y-axis travel |
350 |
mm |
Z-axis travel |
400 |
mm |
Worktable |
Table size |
1900x650 |
mm |
Max. load |
3000 |
mm |
Spindle |
Tool holder specifications |
BT50-190 |
/ |
Spindle speed |
20-3000 |
rpm |
Power |
Spindle motor power |
15/18.5 |
KW |
Tool magazine |
ATCcapacity |
8 |
T |
Tool change time |
8 |
S |
Max. tool weight |
8 |
KG |
Feed |
X, Y, Z axis fast moving speed |
10/10/10 |
mm/min |
Feed speed |
8/8/8 |
Accuracy |
Positioning accuracyGB/T 17421.2-2000 |
0.02/1000 |
mm |
Repeat positioning accuracyGB/T 17421.2-2000 |
0.015/1000 |
Source |
Total machine power |
60 |
KW |
Air source |
6-8 |
kg/cm² |
Size & weight |
Machine space |
5000*3200*2510 |
mm |
Machine weight |
20 |
T |

















1. What is your minimum order quantity and warranty?
MOQ is one set, and the warranty is one year.
2. What CNC system do you use?
FANUC, SIEMENS, MISTSUBISHI, etc. It depends on your choice.
3. When is the delivery time?
Conventional Machines:We will deliver them within 30-45 working days after receiving your deposit. If some special machines require more time, we will give you the answer accordingly.
4. What is the package of the machines?
Packing: PE bag cover inside Plywood box + Steel beam frame.
5. How can I choose the most suitable machines?
Please let us know your machining demand or machine size, so we can choose the best model for you, or you can choose the exact model by yourself. You can also send us the product drawing, and we will choose the most suitable machines for you.
6. What are your trade terms?
FOB, CFR, CIF, or other terms are all acceptable.
7. What are your payment terms?
Payment Terms: T/T 30% advance, 70% before shipment.